In 2004 contour was asked to attend GEA AG's general assembly again, this time at the "Ruhrfestspielhaus" in Recklinghausen.
In addition to the classic crafts sounding, AV and camera equipment, a TV-suitable lighting, a pedestal concept relusting from a previous visualization, an extended presence area and an improved back office with infrared communication equipment were used.
For logistic reasons the contour stageing department installed a 4m high dividing wall between presence area and back office, which achieved an optical separation as well as an acoustic insulation. The stage pedestal with CI-concept was realized by contour as well.


